PROJECT CONTROL AND COORDINATION

  Construction is a Chaos where Different Business Items Follow Each Other, No Problem is Accepted as a Problem, and It Is Very Open to Reversible / Irreversible Errors. Even if you work with a good project team, Decision Errors and Errors in Accounts in Projects are in the Nature of the Project due to the Limitation of the Project Design Time, Stress, the Complexity of the Work / Process or the 'White Looking White Sees' Principle. Although it is not possible to reset them, they can be minimized.

  Analysis, Decisions, Permissions  After the Process, Design Criteria and Preliminary Studies, Plot Data and Technical Documents Should Be Fully Transferred to Selected Project Owners and the Design Process Should be Managed. A joint product of the Architecture and Engineering Professions, the Building Increases or Decreases the Value of the Land It Will Occupy More Than 50 Years, Makes Its Investors Happy or Sad.

  After Our Experience in Producing Robust Buildings in Russia and Surrounding Countries, We Witnessed and We Witnessed Many Disappointments When We Look at the Structures Built with the Extreme Freedom of the Market in Our Country, the Lack of Application Experience of Most of the Project Owners and the Inadequacy of the Teams in the Field.

İnşaat Kat Karşılığı ve Taahhüt Sözleşmesi Uyuşmazlıkları

  For this reason, we are negotiating with the Investor and the Project Designers and then with the Bridge Contractors, by accompanying the Project Design and Bid Processes, so that the Construction can be completed in accordance with its Goals.

   A) Architectural Project Control Items:

  • Making Necessary Negotiations by Interpreting Legislation and Obtaining Zoning Permit,

  • Checking the Best Use of Land Based on Map Data, 

  • Control of Use of Zoning Permit (TAKS, KAKS, Precedent, Height, Towing Distances) in Floor Plans,

  • Controlling the Layout of Buildings in the Layout Plan and the Independent Sections in the Floor Plans,

  • Control of the Locations and Measurements of the Carrier System (Column,  Curtain and Beam),

  • Controlling the Ergonomics of Independent Sections and Indoor and Outdoor Common Areas and Meeting the Needs,

  • Control of Building Entrance-Staircase-Elevator and Apartment Doors, Window-Balcony Locations and Furnishing and Socket and Shaft Locations According to These Places in Floor Plans,

  • Checking Overlap of Architectural and Static Projects by Matching 

  • On Plans and Facades  Checking that the Most Efficient Coating Materials and Details are Selected and Used Correctly,

  • The Most Efficient in Plans and Facades  Controlling the Selection and Correct Use of Heat - Water - Sound Insulation Materials and Details ,

  •  Control of Coating Materials and Details of Common Areas in the Garden,

  • Checking the Compliance and Accuracy of 3D Images with Floor Plans and Facade Design in the Architectural Project,