PROJECT CONTROL AND COORDINATION

  Construction is a Chaos where Different Business Items Follow Each Other, No Problem is Accepted as a Problem, and It Is Very Open to Reversible / Irreversible Errors. Even if you work with a good project team, Decision Errors and Errors in Accounts in Projects are in the Nature of the Project due to the Limitation of the Project Design Time, Stress, the Complexity of the Work / Process or the 'White Looking White Sees' Principle. Although it is not possible to reset them, they can be minimized.

  Analysis, Decisions, Permissions  After the Process, Design Criteria and Preliminary Studies, Plot Data and Technical Documents Should Be Fully Transferred to Selected Project Owners and the Design Process Should be Managed. A joint product of the Architecture and Engineering Professions, the Building Increases or Decreases the Value of the Land It Will Occupy More Than 50 Years, Makes Its Investors Happy or Sad.

  After Our Experience in Producing Robust Buildings in Russia and Surrounding Countries, We Witnessed and We Witnessed Many Disappointments When We Look at the Structures Built with the Extreme Freedom of the Market in Our Country, the Lack of Application Experience of Most of the Project Owners and the Inadequacy of the Teams in the Field.

İnşaat Kat Karşılığı ve Taahhüt Sözleşmesi Uyuşmazlıkları
bottom of page